Students intently viewing their phones

Wireless Upgrade Work to Begin September 24

Thursday, September 12, 2019

Enterprise Network & Communication Services (ENCS) is in the process of upgrading Wi-Fi at Penn State. As part of the project, wireless access points are being replaced and/or upgraded. Work in the Woods and Village at Penn State Berks will begin September 24 and may impact residents and guests:

  • Work is scheduled to occur Tuesday, September 24 and Wednesday, September 25.
  • Technicians will require access to student rooms that house wireless access points; work in these rooms will occur between 10:00 a.m. and 7:00 p.m. and should take between 5-10 minutes per room. Students do not need to be present for work to occur.
  • As new and/or upgraded wireless access points are programmed and brought online, localized wireless outages may occur. Any such outages should be limited to one hour and one-two wings or floors at a time.
  • Wireless access in dining areas and other buildings on campus should not be impacted.

Visit wireless.psu.edu for information about Penn State's wireless networks and how to connect. Residents with questions about work being performed in their rooms can contact Housing and Food Services at 610-396-6353 or housingBK@psu.edu